Skip to content
Pattern on made-up data

T-10476

Can't bill yet

Northgate Montney Energy Ltd. Job on Nov 18, 2026. Texted in by Corey M.

Peace Country Vac & Water
10412 Alaska Road North, Fort St. John, BC
Field ticket
No. 10476
Client
Northgate Montney
Date
Nov 18 / 26
Unit no.
VT-14
Location
Pad B 3-22-86-19 W6
PO no.
AFE
26-0412
Work done
Vac out flowback tank, haul to disposal
DescriptionQtyRate
Operator1?.5 h72.00
Vac truck10.5 h175.00
Disposal28 m³28.00
Travel164 km2.10
Operator
Corey M.
Client representative signature
R. Okafor
White: clientCanary: officePink: book

Plus and minus zoom, R rotates, 0 fits the photo, arrow keys move it.

Flags

  • No PO numberBlocks billing
    Northgate kicks back invoices without a PO. Ask Corey or the company man for it.
    On the ticket: PO no.
  • Hours unclearNeeds a look
    The operator hours could read 10.5 or 16.5. The vac truck line says 10.5.
    On the ticket: Qty, line 1
  • Rate is off the rate sheetNeeds a look
    Vac truck written at $175.00/h. Northgate's rate sheet says $165.00/h from Apr 1, 2026.
    On the ticket: Rate, line 2

What the ticket says

On paperNorthgate Montney
On paperNov 18 / 26
On paperVT-14
On paperblank

Blank on the paper. Northgate needs one on every invoice.

On paper26-0412
On paperPad B 3-22-86-19 W6
On paperR. Okafor

Ticket lines

Ticket lines with what the paper says
LineQtyRateAmount
Operator
Pick
On paper: 1?.5
$72.00
On paper: 72.00
Waiting on hours
Vac truck, tandem
10.5 h
On paper: 10.5
$175.00
On paper: 175.00
$1,837.50
Disposal
28 m3
On paper: 28
$28.00
On paper: 28.00
$784.00
Travel
164 km
On paper: 164
$2.10
On paper: 2.10
$344.40
Subtotal$2,965.90
GST 5%$148.30
Total$3,114.20

What happened

  1. Corey M. texted a photo of the ticket

  2. Floorhand read the ticket and raised 3 flags

  3. Floorhand asked Corey for the PO number by text

  4. Dana R. opened the ticket

3 flags to settle before billing.